{"id":110,"date":"2025-01-16T11:51:04","date_gmt":"2025-01-16T10:51:04","guid":{"rendered":"https:\/\/staging.start-klar.net\/?page_id=110"},"modified":"2025-06-01T19:20:41","modified_gmt":"2025-06-01T17:20:41","slug":"start-taunus","status":"publish","type":"page","link":"https:\/\/staging.start-klar.net\/en\/start-taunus\/","title":{"rendered":"Start Taunus"},"content":{"rendered":"<p>Keine Eilmeldungen gefunden.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-text-align-center\" id=\"aktuelles\">Current information<\/h2>\n\n\n<div class=\"baustelle-list\"><div class=\"baustelle-item\"><div class=\"baustelle-content\">\n<p class=\"has-text-align-center has-startklar-pink-color has-text-color has-link-color wp-elements-bffa98d575e1f43391a72e932ec5ab8e\"><strong><strong><strong>RB16 \u2013 CLOSURE 8.3. from 8 pm<\/strong><\/strong><\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\">Due to work on the control and safety technology, the RB16 line will be closed to rail traffic&nbsp;<strong>from 8.3. from 8 p.m. until the end of operations on 22.3.2025<\/strong>.&nbsp; A rail replacement service (SEV) has been set up. Please note the changed departure times of the SEV.<\/p>\n\n\n\n<p class=\"has-text-align-center\">Click here for the\u00a0<a href=\"https:\/\/start-klar.net\/wp-content\/uploads\/2025\/03\/SEV_RB16_8Mar25_akt.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">SEV timetable<\/a>.<\/p>\n\n\n\n<p class=\"has-text-align-center\"><\/p>\n\n\n\n<p><\/p>\n<\/div><\/div><hr class=\"baustelle-divider\"><div class=\"baustelle-item\"><div class=\"baustelle-content\">\n<p class=\"has-text-align-center has-startklar-pink-color has-text-color has-link-color wp-elements-50239d04d8787486286e448f7c96cb59\"><strong><strong><strong><strong>RB15 \u2013 PARTIAL CLOSURE from 24.3. between Bad Homburg und K\u00f6ppern&nbsp;<\/strong><\/strong><\/strong><\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\">Due to work on the control and safety technology, the section <strong>between Bad Homburg and K\u00f6ppern on the RB15 will be suspended from&nbsp;24.3. to 1.4.2025 from 10 pm till end of service as well as on 29. and 30.3. all<strong> day<\/strong><\/strong>.&nbsp;A rail replacement service (SEV) with buses has been arranged.&nbsp;<\/p>\n\n\n\n<p class=\"has-text-align-center\">Click here for the\u00a0<a href=\"https:\/\/staging.start-klar.net\/wp-content\/uploads\/2025\/03\/SEV_RB15_Mar2025_aktuell.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">SEV timetable<\/a>.<\/p>\n\n\n\n<p class=\"has-text-align-center\"><\/p>\n\n\n\n<p><\/p>\n<\/div><\/div><hr class=\"baustelle-divider\"><div class=\"baustelle-item\"><div class=\"baustelle-content\">\n<p class=\"has-text-align-center has-pink-color has-text-color has-link-color wp-elements-dfee2aa82957960d4c8700e4e6377d78\"><strong><strong>RB12 \u2013 PARTIAL CLOSURE 15. &#8211; 30.3.2025<\/strong><\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\">Due to the closure of the route via Mainzer Landstra\u00dfe, the <strong>RB12 can only run between K\u00f6nigstein and Frankfurt H\u00f6chst from 15.3. from 8 p.m. until 30.3.2025<\/strong>. The Frankfurt H\u00f6chst &#8211; Frankfurt Hauptbahnhof section will be closed. Passengers can use the <strong>S-Bahn<\/strong> or other local trains as an alternative. The journey time will be extended by around 10 minutes.<\/p>\n\n\n\n<p class=\"has-text-align-center\">Click here for the changed <a href=\"https:\/\/staging.start-klar.net\/wp-content\/uploads\/2025\/03\/RB12_Mar25.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">timetable of the RB12<\/a>.<\/p>\n\n\n\n<p><\/p>\n<\/div><\/div><hr class=\"baustelle-divider\"><div class=\"baustelle-item\"><div class=\"baustelle-content\">\n<p class=\"has-text-align-center has-startklar-pink-color has-text-color has-link-color wp-elements-b2662422584042fb595d71848aff4d28\"><strong><strong><strong><strong><strong>RB16 \u2013 CLOSURE from 24.3. to 1.4.2025 in the evening and on weekends<\/strong><\/strong><\/strong><\/strong><\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\">Due to work on the control and safety technology, the <strong>RB16 will be closed to rail traffic from 24.3. to 1.4.2025 from 22:00 until the end of operations and all day from 29 to 30.3. <\/strong>(end of operations). A rail replacement service (SEV) with buses has been set up in each case. Please note the changed departure times of the buses.<\/p>\n\n\n\n<p class=\"has-text-align-center\">Click here for the\u00a0<a href=\"https:\/\/staging.start-klar.net\/wp-content\/uploads\/2025\/03\/SEV_RB16_24Mar25.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">SEV timetable<\/a>.<\/p>\n\n\n\n<p><\/p>\n<\/div><\/div><hr class=\"baustelle-divider\"><div class=\"baustelle-item\"><div class=\"baustelle-content\">\n<p class=\"has-text-align-center has-pink-color has-text-color has-link-color wp-elements-7d879ec7cf1cf731d228be7629d9eb8a\"><strong><strong>RB12 \u2013 <strong>IMPORTANT INFORMATION<\/strong><\/strong><\/strong><\/p>\n\n\n\n<p class=\"has-text-align-center\">Due to an understaffed signal box, the\u00a0<strong>RB12 will only run between K\u00f6nigstein and Frankfurt H\u00f6chst between 20:00 and 23:50<\/strong>\u00a0until further notice (the Frankfurt H\u00f6chst \u2013 Frankfurt Hbf section will be canceled). Passengers can alternatively use the S1, the journey time is extended by around 10 minutes.<\/p>\n\n\n\n<p class=\"has-text-align-center\">Please click here for the corresponding\u00a0<a href=\"https:\/\/staging.start-klar.net\/wp-content\/uploads\/2025\/02\/RB12_Unterbesetzung_abDez2024.pdf\" target=\"_blank\" rel=\"noreferrer noopener\">timetable.<\/a><\/p>\n<\/div><\/div><\/div>\n\n\n\n<details class=\"wp-block-huishu-agentur-huishu-faq-block\"><summary><p>Further Informationen<\/p><\/summary><div class=\"faq-details\">\n<p>You can find out everything about the Taunusnetz and the RMV on\u00a0<a href=\"http:\/\/www.rmv.de\/\">www.rmv.de<\/a><\/p>\n<\/div><\/details>\n\n\n\n<details class=\"wp-block-huishu-agentur-huishu-faq-block\"><summary><p>Frequently Asked Questions<\/p><\/summary><div class=\"faq-details\">\n<p>Take a look at\u00a0<a href=\"https:\/\/www.rmv.de\/c\/de\/service\/infos\/faq-haeufig-gestellte-fragen\">rmv.de\/faq<\/a><\/p>\n<\/div><\/details>\n\n\n\n<details class=\"wp-block-huishu-agentur-huishu-faq-block\"><summary><p>Jobs<\/p><\/summary><div class=\"faq-details\">\n<p>Find out more about <a href=\"https:\/\/www.startgmbh.com\/taunus\" target=\"_blank\" rel=\"noreferrer noopener\">job oppotunities at Start Taunus<\/a>.<\/p>\n<\/div><\/details>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Current information<\/p>\n","protected":false},"author":1,"featured_media":333,"parent":0,"menu_order":20,"comment_status":"closed","ping_status":"closed","template":"template-taunus.php","meta":{"footnotes":""},"class_list":["post-110","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/staging.start-klar.net\/en\/wp-json\/wp\/v2\/pages\/110","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staging.start-klar.net\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/staging.start-klar.net\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/staging.start-klar.net\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/staging.start-klar.net\/en\/wp-json\/wp\/v2\/comments?post=110"}],"version-history":[{"count":32,"href":"https:\/\/staging.start-klar.net\/en\/wp-json\/wp\/v2\/pages\/110\/revisions"}],"predecessor-version":[{"id":760,"href":"https:\/\/staging.start-klar.net\/en\/wp-json\/wp\/v2\/pages\/110\/revisions\/760"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/staging.start-klar.net\/en\/wp-json\/wp\/v2\/media\/333"}],"wp:attachment":[{"href":"https:\/\/staging.start-klar.net\/en\/wp-json\/wp\/v2\/media?parent=110"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}